<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">PBES</journal-id><journal-title-group><journal-title>Proceedings of Business and Economic Studies</journal-title></journal-title-group><issn>2209-2641</issn><eissn>2209-265X</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/PBES.v9i10.16186</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Research on the Construction of a Multi-Project Financial Evaluation System in Yalong River</title><url>https://artdesignp.com/journal/PBES/9/10/10.26689/PBES.v9i10.16186</url><author>ZhangYi,WangYahua,LuanDegang,QiuZhipeng,HanTingting</author><pub-date pub-type="publication-year"><year>2026</year></pub-date><volume>9</volume><issue>10</issue><history><date date-type="pub"><published-time>2026-11-16</published-time></date></history><abstract>This study aims to construct a multi-project financial evaluation system tailored to the characteristics of hydropower-wind-solar complementarity in the Yalong River Basin. By integrating the Monte Carlo simulation method through a microservices architecture, the study innovatively implements a calculation function for cascaded hydropower station combinations. The system adopts an advanced &amp;ldquo;data middle platform + business frontend&amp;rdquo; model, integrating the TDengine time-series database with Three.js visualization technology, thereby overcoming key technical challenges such as sensitivity analysis of electricity price fluctuations and cross-project cash flow coordination. System testing results indicate that the system achieves a financial calculation speed of 2.8 &amp;plusmn; 0.2 seconds, a sensitivity analysis accuracy of &amp;plusmn;0.27%, a data throughput of 58.4 MB/s, and a fault recovery time of 9 minutes and 23 seconds, meeting the expected design standards and requirements. The research findings provide digital and intelligent tool support for investment decision-making in clean energy bases and have been successfully applied to financial management practices for 14.7 million kilowatts of installed capacity in the Yalong River Basin.</abstract><keywords>Yalong River, Multi-project, Financial evaluation, System development</keywords></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>[1] Huang N, Hu S, Chen J, 2025, A Brief Discussion on the Pathways for Digital and Intelligent Development of Research Management and Financial Accounting Systems in Higher Education Institutions. Money China, (8): 135&amp;ndash;137.
[2] An K, Wang X, Xu X, et al., 2024, Practices in Full Life-Cycle Financial Management of New Energy Projects at Company N Based on a Financial Platform. Finance and Accounting, (16): 24&amp;ndash;26.
[3] Kang L, Zhang C, Zhang N, et al., 2024, A Preliminary Discussion on the Evaluation Indicator System and Methods for Post-Evaluation of Equity Investment Projects. Aerospace Industry Management, (2): 5&amp;ndash;10.
[4] Dong Q, Liu Y, Zhou R. 2023, A Study on the Investment Evaluation Indicator System for Transportation Construction Projects. China Market, (14): 40&amp;ndash;43.
[5] Hu S, 2025, A Study on the Construction of a Project Cost Control and Performance Evaluation System for Construction Enterprises. Charming China, (8): 137&amp;ndash;139.
[6] Sima H, 2023, Construction of Financial Management Model for Scientific Research Projects in Mining Enterprises. Business 2.0, (15): 89&amp;ndash;91.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
