<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JARD</journal-id><journal-title-group><journal-title>Journal of Architectural Research and Development</journal-title></journal-title-group><issn>2208-3529</issn><eissn>2208-3537</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jard.v6i4.4024</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>BIM Technology in Application of Structure Construction in Hubei Olympic Sports Center</title><url>https://artdesignp.com/journal/JARD/6/4/10.26689/jard.v6i4.4024</url><author>LuTong,RaoShu,LiuYing,WangShuai,WuKe-yang,XiaJin,ZouJie-zong</author><pub-date pub-type="publication-year"><year>2022</year></pub-date><volume>6</volume><issue>4</issue><history><date date-type="pub"><published-time>2022-07-13</published-time></date></history><abstract>With the rapid development of modern large-span and large-complex steel structure buildings, at present the Building Information Modeling (BIM) technology plays an important role from the design to the construction of a building. This study takes the Comprehensive Gymnasium of Hubei Olympic Sports Center as the carrier and introduce the BIM technology from two aspects; The technology; and the management. Further, the optimal application of BIM technology in the complex component nodes, the technical guidance of component processing, and the correction and verification of drawings were emphatically analyzed in this paper. An engineering practice shows that the application of BIM technology has greatly improved the production efficiency, shortened the construction period, reduced unnecessary cost, and lastly laid a solid foundation for the smooth completion of the project.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Zhang Y, Gao Z, Liu Z, et al., 2021, As Swift as a Swan as Graceful as a Dragon on the Design of National Sliding Center. Architectural Journal, 2021(Z1): 104-109 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Zhao L, You D, Zhang Y, et al., 2017, Design Innovation and Key Construction Technique of Beijing Yanqi Lake International Convention and Exhibition Center Project. Architecture Technology, 48(6): 566-571 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Nie Q, Xu B, Huang R, 2021, Deepening Design of Outrigger and Waist Truss Layer of 288m Super High-Rise Office Building. Building Structure, 51(S1): 157-159 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Ding WS, Zhang BB, 2017, Hazard Management of Large-scale Steel Structure Construction Based on BIM Technology. Journal of Civil Engineering and Management, 34(3): 13-19 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Lin W, Zhang Y, Zhao H, et al., 2021, Risk Management of Program Schedule Based on BIM-CCM. Yangtze River, 52(S2): 335-340 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Tong Z, Wang G, LI GJ, et al., 2021, Application of BIM and GIS Integration Technology for Channel Regulation Project. Port &amp; Waterway Engineering, 2021(4): 163-168+179 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Qin YW, Shi WJ, Xiao MZ, 2019, Engineering Quality Control of Bridge Steel Components Based on BIM+3D Laser Scanning Technology. Journal of Civil Engineering and Management, 36(4): 119-125 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Su K, Zhang Y, Zhang E, et al., 2017, Construction Technology of Large Span Heavy Steel Truss of a Commercial Center High Roof. Construction Technology, 46(8): 83-87 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Li HF, Cui J, Gan M, et al., 2013, BIM Technology in Structural Design of the Retractable Roof of Shaoxing Stadium. Building Structure, 43(17): 144-148 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Wu J, 2021, The Essence of BIM and Cognition of Engineering Practice. Journal of Railway Engineering Society, 38(3): 72-79 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B11" content-type="article"><label>11</label><element-citation publication-type="journal"><p>Lu T, 2015, Low-position Assembly of Ellipsoid Shell of Wuhan International Expo Center. Construction Technology, 2015(17): 18-21+32 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B12" content-type="article"><label>12</label><element-citation publication-type="journal"><p>Lu T, Hu Z, Ma C, et al., 2015, Detail Design and Analysis of Ellipsoid Steel Corridor of Wuhan International Expo Center. Construction Technology, 2015(17): 1-4+17 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B13" content-type="article"><label>13</label><element-citation publication-type="journal"><p>Zheng HH, Liu Y, Li Y, 2015, A Review on Research and Application of the BIM Technology. Structural Engineers, 31(4): 233-241 (in Chinese).</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
