<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JARD</journal-id><journal-title-group><journal-title>Journal of Architectural Research and Development</journal-title></journal-title-group><issn>2208-3529</issn><eissn>2208-3537</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jard.v8i4.7850</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Discussion on Cost Budgeting and Cost Control Strategies for Prefabricated Construction Projects</title><url>https://artdesignp.com/journal/JARD/8/4/10.26689/jard.v8i4.7850</url><author>ChengCongzi</author><pub-date pub-type="publication-year"><year>2024</year></pub-date><volume>8</volume><issue>4</issue><history><date date-type="pub"><published-time>2024-08-09</published-time></date></history><abstract>In the process of China’s national economic development, the construction industry is a very important component and has a direct impact on the level of China’s economic construction. Nowadays, the development speed of the prefabricated construction industry is constantly accelerating. To effectively ensure the economic benefits of engineering projects, it is necessary to comprehensively strengthen cost budgeting and cost control. This article analyzes the cost budget of prefabricated construction projects, introduces the application advantages of prefabricated construction, and proposes specific cost budgeting and cost control measures, hoping to provide some reference for relevant researchers.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Xu J, 2021, Construction Project Cost Management Model Based on Big Data. Journal of Physics: Conference Series, 1852(2): 022017.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Pham H, Luu TV, Kim SY, et al., 2020, Assessing the Impact of Cost Overrun Causes in Transmission Lines Construction Projects. KSCE Journal of Civil Engineering, 24(1): 1029–1036.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Rachmawati F, Mudjahidin M, Widowati ED, 2022, Work Rate Modeling of Building Construction Projects Using System Dynamic to Optimize Project Cost and Time Performance. International Journal of Construction Management, 24(2): 213–225.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Sahadi S, Sriyono E, 2022, Examining Workers Motivation in Construction Project with Structural Equation Modelling. Cogent Engineering, 9(1): 153–159.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Chen S, 2022, Construction Project Cost Management and Control System Based on Big Data. Mobile Information Systems, 2022(1): 1–7.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Ibrahim AH, Mohamed L, 2021, Assessment of Construction Project Cost Estimating Accuracy in Egypt. The Open Civil Engineering Journal, 15(1): 290–298.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
