<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JARD</journal-id><journal-title-group><journal-title>Journal of Architectural Research and Development</journal-title></journal-title-group><issn>2208-3529</issn><eissn>2208-3537</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jard.v9i3.10650</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Research on Engineering Quantity List Pricing and Project Cost Management of Construction Enterprises</title><url>https://artdesignp.com/journal/JARD/9/3/10.26689/jard.v9i3.10650</url><author>ZhanQinrong</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>3</issue><history><date date-type="pub"><published-time>2025-05-30</published-time></date></history><abstract>In the increasingly competitive construction market, the engineering quantity list pricing model, as an important way of project cost management, is of crucial significance for construction enterprises to control costs and enhance benefits. This study deeply analyzes the characteristics of engineering quantity list pricing, and elaborates on the dilemmas faced by construction enterprises in project cost control, such as lagging concepts, imperfect mechanisms, weak risk management and control, and lack of construction-stage management. Based on this, from the dimensions of strengthening management and control concepts, improving supervision mechanisms, enhancing risk management and control capabilities, and attaching importance to construction-stage cost management, this study proposes project cost management and control strategies that are in line with the actual situation of construction enterprises, aiming to promote construction enterprises to achieve scientific management and optimization of project costs under the engineering quantity list pricing model.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Zhao L, 2024, Research on the Bill of Quantities Pricing Model for Prefabricated Buildings Based on BIM. Journal of Engineering Research and Reports, 26(12): 95–105.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Senanayake A, Gunawardana PAM, Perera KKS, et al., 2024, Examining the Potential Use of Augmented Reality in Construction Cost Management Tools and Techniques. Journal of Engineering, Design and Technology, 22(6): 1847–1869.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Li H, 2024, Comprehensive Review on Valuation Method for Bill of Quantities in Prefabricated Shear Wall Structures Using BIM. Journal of Engineering Research and Reports, 26(10): 136–146.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Chen C, 2024, Cost Control Strategies in the Pre-Construction Period of Highway Construction. Journal of Architectural Research and Development, 8(3): 104–109.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Li X, 2024, Research on Cost Optimization of Prefabricated Buildings Based on Genetic Algorithm. E3S Web of Conferences, 565: 1–4.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Chen K, Fang G, 2024, Analysis of the Current Status and Comprehensive Application Research on BIM Technology in Construction Cost Management. E3S Web of Conferences, 1–6.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Mostofi F, Togan V, Basaga HB, et al., 2023, Multiedge Graph Convolutional Network for House Price Prediction. Journal of Construction Engineering and Management, 149(11): 1–16.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Peng Z, 2022, Cost Management Strategy of Highway Engineering Construction Stage Using the List Pricing Model. Journal of World Architecture, 6(5): 47–52.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Sepasgozar SME, Costin AM, Karimi R, et al., 2022, BIM and Digital Tools for State-of-the-Art Construction Cost Management. Buildings, 12(4): 396–396.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Han L, Liu C, Ren Z, et al., 2022, Research on Project Cost Management under the Mode of Bill of Quantities Valuation. International Journal of Frontiers in Engineering Technology, 4(2): 1–10.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B11" content-type="article"><label>11</label><element-citation publication-type="journal"><p>Zhan Z, Tang Y, Wang C, et al., 2022, System Dynamics Outlook on BIM and LEAN Interaction in Construction Quantity Surveying. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 46(5): 1–16.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B12" content-type="article"><label>12</label><element-citation publication-type="journal"><p>Yang J, 2021, Application of BIM Technology in Construction Cost Management of Building Engineering. Journal of Physics: Conference Series, 2037(1): 1–6.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B13" content-type="article"><label>13</label><element-citation publication-type="journal"><p>Liao L, 2021, Research on the Application of BIM Technology in the Cost Management of Construction Projects. IOP Conference Series: Earth and Environmental Science, 783(1): 012098</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B14" content-type="article"><label>14</label><element-citation publication-type="journal"><p>Ding X, Lu Q, 2021, Construction Cost Management Strategy Based on BIM Technology and Neural Network Model. Journal of Intelligent &amp; Fuzzy Systems, 40(4): 6669–6681.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B15" content-type="article"><label>15</label><element-citation publication-type="journal"><p>Xu J, 2021, Construction Project Cost Management Model Based on Big Data. Journal of Physics: Conference Series, 1852(2): 1–6.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
