<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JARD</journal-id><journal-title-group><journal-title>Journal of Architectural Research and Development</journal-title></journal-title-group><issn>2208-3529</issn><eissn>2208-3537</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jard.v9i3.10705</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>An Analytical Perspective on Curtain Wall Project Management</title><url>https://artdesignp.com/journal/JARD/9/3/10.26689/jard.v9i3.10705</url><author>ChengZijian,MaHaibo,LiuWenhao,LiBaixian</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>3</issue><history><date date-type="pub"><published-time>2025-06-04</published-time></date></history><abstract>Over the past four decades, propelled by China’s reform and opening-up policies, urban construction in the country has undergone rapid and transformative development. Within this context, the curtain wall, serving as both the exterior enclosure and aesthetic façade of buildings, has become a defining element of modern architecture. As a specialized component within the overall construction system, curtain wall projects demand a high level of expertise in both technical execution and project management. This study explores a unique analysis and reflection on the labor management and schedule control of curtain wall projects.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Ma M, Tian L, 2015, Construction Engineering Management and Practice (3rd Edition). Intellectual Property Publishing House: 176.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Xu Y, 2021, Project Management of Curtain Wall Based on BIM Technology. Green Building, 13(4): 100–103.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Hou Q, 2024, Research on Cost Consultation Management of Whole Process Engineering Consultation Project. Construction Supervision, 2024(7): 65–67.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Wang Z, 2020, A Brief Analysis on How to Do Well the Project Management of Special-Shaped Curtain Wall Engineering. Construction Supervision, 2020(S1): 23–26.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Liu Z, 2019, Analysis on the Practice and Development Trend of Construction Curtain Wall Project Management. Doors and Windows, 2019(21): 1.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Li M, 2023, Technical Characteristics, Construction Key Points and Quality Control of Stone Curtain Wall. Stone, (6): 16–18, 55.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Zeng J, 2021, Application of BIM Technology in the Design and Project Management of Inclined Arc-Shaped Glass Curtain Wall. Housing and Real Estate, 2021(15): 172–173.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Yang G, 2019, Research on the Application of BIM in Architectural Curtain Wall Design and Project Management, thesis, Shijiazhuang Tiedao University.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Liu Y, 2022, Construction Management Measures and Countermeasures of Stone Curtain Wall. Stone, 2022(12): 79–81.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Qin C, 2025, Research on Cost Management Strategy of Curtain Wall Project – Taking Zhuhai Tiejian Square Project as an Example. China Management Informationization, 28(6): 25–27.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B11" content-type="article"><label>11</label><element-citation publication-type="journal"><p>Ruan S, 2024, Analysis of Key and Difficult Points in the Construction of a Curtain Wall Project and Quality Assurance Measures. Engineering Technology Research, 9(22): 155–157.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B12" content-type="article"><label>12</label><element-citation publication-type="journal"><p>Qi J, 2016, Practice and Development Trend of Architectural Curtain Wall Project Management. China Plant Engineering, 2016(8): 29–30.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B13" content-type="article"><label>13</label><element-citation publication-type="journal"><p>Bai H, 2024, The Application of Flow Construction Technology in the Construction Management of Curtain Wall Projects. Doors and Windows, 2024(17): 7–9.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B14" content-type="article"><label>14</label><element-citation publication-type="journal"><p>Dou Y, 2024, Research on Construction Technology Management and Construction Quality Assurance of Curtain Wall Engineering in Real Estate Projects. Engineering Construction and Design, 2024(16): 230–232.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B15" content-type="article"><label>15</label><element-citation publication-type="journal"><p>Ye Z, 2023, Analysis of Optimization Strategies for Construction Progress Management of Stone Curtain Wall Project. Stone, 2023(1): 43–45.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
