<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JARD</journal-id><journal-title-group><journal-title>Journal of Architectural Research and Development</journal-title></journal-title-group><issn>2208-3529</issn><eissn>2208-3537</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jard.v9i4.11513</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Optimization of Schedule Management for Small Municipal Engineering Projects</title><url>https://artdesignp.com/journal/JARD/9/4/10.26689/jard.v9i4.11513</url><author>ChenChuhong</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>4</issue><history><date date-type="pub"><published-time>2025-08-06</published-time></date></history><abstract>Small municipal projects, constrained by resources and extensive management models, commonly face issues of delayed progress and cost overruns. This study uses a road renovation project in a city as an empirical case. By integrating BIM collaborative platforms with real-time IoT monitoring systems, it achieves construction conflict prediction and dynamic resource allocation. Combining rolling planning methods and risk probability models, a “forecast-adaptation” dual-mode management framework is formed. After implementation, the total duration was shortened by 15%, the rework rate decreased by 20%, and inter-departmental communication efficiency improved by 30%. The case validates the effectiveness of digital tools and dynamic mechanisms working together to optimize, aligning with the requirements for refined control outlined in the “Construction Engineering Quantity List Pricing Standard” (GB/T50500-2024). It provides a replicable progress management paradigm for similar projects.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Cooke B, Williams P, 2025, Construction Planning, Programming and Control. John Wiley &amp; Sons, USA.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Kerzner H, 2025, Project Management: A Systems Approach to Planning, Scheduling, and Controlling. John Wiley &amp; Sons, USA.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Dasović B, Galić M, Klanšek U, 2020, A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling. Sustainability, 12(8): 3405.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Ansari R, Khalilzadeh M, Hosseini MR, 2022, A Multi-Objective Dynamic Optimization Approach to Project Schedule Management: A Case Study of a Gas Field Construction. KSCE Journal of Civil Engineering, 26(3): 1005–1013.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Rosłon J, Książek-Nowak M, Nowak P, 2020, Schedules Optimization with the Use of Value Engineering and NPV Maximization. Sustainability, 12(18): 7454.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Parsamehr M, Perera U S, Dodanwala T C, et al., 2023, A Review of Construction Management Challenges and BIM-Based Solutions: Perspectives from the Schedule, Cost, Quality, and Safety Management. Asian Journal of Civil Engineering, 24(1): 353–389.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Pregnolato M, Gunner S, Voyagaki E, et al, 2022, Towards Civil Engineering 4.0: Concept, Workflow and Application of Digital Twins for Existing Infrastructure. Automation in Construction, 141: 104421.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Suresh D, Sivakumar A, 2021, An Empirical Study, Analysis and Investigation About Impact of Schedule Management Plan in Project Management Effectiveness Using Structural Equation Modeling. Int J Adv Eng Manag, 3(9): 810–834.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Assaad R, El-Adaway IH, Abotaleb IS, 2020, Predicting Project Performance in the Construction Industry. Journal of Construction Engineering and Management, 146(5): 04020030.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Jackson BJ, 2020, Construction Management JumpStart: The Best First Step Toward a Career in Construction Management. John Wiley &amp; Sons, USA.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
