<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JARD</journal-id><journal-title-group><journal-title>Journal of Architectural Research and Development</journal-title></journal-title-group><issn>2208-3529</issn><eissn>2208-3537</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jard.v9i4.11527</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Study on the Coordinated Management of Construction Project Schedule and Quality</title><url>https://artdesignp.com/journal/JARD/9/4/10.26689/jard.v9i4.11527</url><author>ZhuangZhiwei</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>4</issue><history><date date-type="pub"><published-time>2025-08-07</published-time></date></history><abstract>This paper explains the goal conflict between schedule and quality in construction projects, including how schedule compression can lead to quality risks, and how quality control may cause delays. It analyzes the internal logic of collaborative management and influencing factors such as construction plans. The paper also introduces collaborative management methods, such as establishing a responsibility traceability system based on Work Breakdown Structure (WBS), and emphasizes the role of intelligent construction technologies and their future development directions.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Li Y, 2023, Research on Collaborative Management of SDWAN Project Group of Company A for Progress Improvement, thesis, Zhejiang: Zhejiang University.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Guo P, 2022, Research on Construction Progress Management Based on 3D Reconstruction Technology and BIM Collaboration, thesis, Chongqing: Chongqing University.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Wang W, 2018, Research on Collaborative Management of Construction Quality of Building Projects Based on BIM, thesis, Shaanxi: Xi’an University of Architecture and Technology.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Gao J, 2018, Research on Collaborative Management of Construction Projects Based on Quality Chain, thesis, Beijing: North China Electric Power University (Beijing).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Jiang N, 2022, Research on Collaborative Management of Progress in the Design Phase of S Project of J Real Estate Company, thesis, Liaoning: Shenyang University of Technology.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Zhou Y, Liu M, Wang B, et al., 2023, Research on Safety Management of Prefabricated Building Construction Based on BIM Technology and Risk Assessment System. Building Structure, 53(S02): 2089–2093.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Niu T, 2023, Research on Safety Issues and Countermeasures of Civil Engineering Construction – Review of “Research on Construction Safety Technology and Management.” Journal of China Safety Science, 33(09): 243–244.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Li X, Guo J, Chen S, 2023, Research on Progress Management Methods of Construction Projects Under the Perspective of Collaborative Construction. Popular Standardization, 2023(11): 88–90.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Wei R, Shao Z, 2023, Research on Progress Management Methods of Construction Projects Under the Perspective of Collaborative Construction. Sichuan Building Materials, 49(01): 254–256.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Song K, 2015, A Brief Analysis of Collaborative Management of Construction Safety and Quality. Construction Engineering Technology and Design, 2015(30): 862.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
