<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JARD</journal-id><journal-title-group><journal-title>Journal of Architectural Research and Development</journal-title></journal-title-group><issn>2208-3529</issn><eissn>2208-3537</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jard.v9i4.11535</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Practice and Exploration of Critical Path Management from the Perspective of Total Construction Period</title><url>https://artdesignp.com/journal/JARD/9/4/10.26689/jard.v9i4.11535</url><author>ChenSonglin</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>4</issue><history><date date-type="pub"><published-time>2025-08-07</published-time></date></history><abstract>This article focuses on the overall construction duration, explaining the core role of the critical path method and its relationship with the total construction period. It analyzes the factors influencing the total construction duration, introduces the application of BIM and other technologies in identifying and managing critical paths, emphasizes the importance of optimizing resource allocation, and illustrates measures to address disruptions through practical examples. Additionally, it discusses the evaluation system and incentive mechanisms.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Fewings P, Henjewele C, 2019, Construction Project Management: An Integrated Approach, Routledge.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Harris F, McCaffer R, Baldwin A, et al, 2020, Modern Construction Management. John Wiley &amp; Sons, UK.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Kerzner H, 2018, Project Management Best Practices: Achieving Global Excellence. John Wiley &amp; Sons, UK.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Garcés G, Peña C, 2023, A Review on Lean Construction for Construction Project Management. Revista Ingeniería de Construcción, 38(1): 43–60.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Atkin B, Brooks A, 2021, Total Facility Management. Wiley-Blackwell, USA.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Morris P W G, 2013, Reconstructing Project Management. John Wiley &amp; Sons.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Smith N J, Merna T, Jobling P, 2014, Managing Risk in Construction Projects. John Wiley &amp; Sons., UK.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Martinelli R J, Milosevic D Z, 2016, Project Management Toolbox: Tools and Techniques for the Practicing Project Manager. John Wiley &amp; Sons, UK.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Cevikbas M, Okudan O, Işık Z, 2022, Identification and Assessment of Disruption Claim Management Risks in Construction Projects: A Life Cycle-Based Approach. Engineering, Construction and Architectural Management, 31(1): 1–27.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Frangopol D M, Liu M, 2019, Maintenance and Management of Civil Infrastructure Based on Condition, Safety, Optimization, and Life-Cycle Cost. Structures and Infrastructure Systems, 2019: 96–108.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
