<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JARD</journal-id><journal-title-group><journal-title>Journal of Architectural Research and Development</journal-title></journal-title-group><issn>2208-3529</issn><eissn>2208-3537</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jard.v9i6.13143</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Practical Research on the Effective Management of Change Visas and Dynamic Cost Control in the Construction Stage of Construction Projects</title><url>https://artdesignp.com/journal/JARD/9/6/10.26689/jard.v9i6.13143</url><author>ZhengJinzhu</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>6</issue><history><date date-type="pub"><published-time>2025-12-15</published-time></date></history><abstract>Construction project construction stage requires effective change visa management and dynamic cost control. This paper defines both, presents related theories, and details challenges in traditional methods. It then proposes an integrated model with system architecture, functional modules, and practical strategies like BIM integrated workflows. A case study validates the effectiveness, and future research on AI enhanced change prediction and blockchain based audit trails is suggested.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Chen L, Luo H, 2022, A BIM-Based Construction and Demolition Waste Information Management System for Greenhouse Gas Quantification and Mitigation. Journal of Environmental Management, 304: 114210.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Zhao X, Hwang B, Lee H, 2020, Identifying Critical Leadership Styles of Project Managers for Green Building Projects. International Journal of Construction Management, 20(6): 585–594.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Pan Y, Zhang L, 2021, A BIM-Data Mining Integrated Digital Twin Framework for Advanced Project Management. Automation in Construction, 124: 103564.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Liu H, Al-Hussein M, Lu M, 2022, BIM-Based Integrated Approach for Detailed Cost Estimation and Schedule Planning of Construction Projects. Advanced Engineering Informatics, 52: 101552.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Shan Y, Goodrum P, 2019, Integrated Framework of Construction Cost Estimation and Schedule Planning Through BIM-Based Quantity Take off. Journal of Construction Engineering and Management, 145(10): 04019063.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Wang J, Hou L, Zhang S, 2021, Real-Time Construction Quality Control and Management Through Dynamic Mobile Inspection. Engineering, Construction and Architectural Management, 28(9): 2681–2697.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Darko A, Chan A, Yang Y, 2020, Artificial Intelligence in the AEC Industry: Scientometric Analysis and Visualization of Research Activities. Automation in Construction, 112: 103081.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Li C, Xue F, Li X, 2021, An Internet of Things-Enabled BIM Platform for On-Site Assembly Services in Prefabricated Construction. Automation in Construction, 128: 103761.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Shan M, Le Y, Yiu T, 2022, Investigating the Impact of Organizational Governance on Construction Safety Climate: A Multi-Level Analysis. Safety Science, 145: 105497.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Wang T, Wang J, Wu P, 2021, Evolutionary Analysis of Collaboration Networks in BIM-Based Construction Projects. Journal of Management in Engineering, 37(6): 04021057.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B11" content-type="article"><label>11</label><element-citation publication-type="journal"><p>Chen Y, Huang J, Yu K, 2020, Cloud-Assisted Real-Time Risk Monitoring System for Construction Projects. Advanced Engineering Informatics, 45: 101126.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B12" content-type="article"><label>12</label><element-citation publication-type="journal"><p>Zhang S, Teizer J, Lee J, 2020, Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules. Automation in Construction, 119: 103311.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B13" content-type="article"><label>13</label><element-citation publication-type="journal"><p>Lu W, Lee W, Xue F, 2022, Blockchain Technology for Construction Supply Chain Digitalization: Theorizing the Practical Use. Journal of Management in Engineering, 38(2): 04021086.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
