<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JCNR</journal-id><journal-title-group><journal-title>Journal of Clinical and Nursing Research</journal-title></journal-title-group><issn>2208-3685</issn><eissn>2208-3693</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jcnr.v7i4.4953</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Construction of a New Model of Contactless Medical Services for Outpatients Based on the Project-Achieving Quality Control Circle</title><url>https://artdesignp.com/journal/JCNR/7/4/10.26689/jcnr.v7i4.4953</url><author>ChenShuang,GaoZhihong,HuangXiaoxia,YinZhiqin</author><pub-date pub-type="publication-year"><year>2023</year></pub-date><volume>7</volume><issue>4</issue><history><date date-type="pub"><published-time>2023-07-05</published-time></date></history><abstract>Objective: To carry out empirical research on the role of project-achieving quality control circle (QCC) in constructing a new model of contactless medical service for outpatients. Methods: A QCC, consisting of information office members from a grade A tertiary hospital in Wenzhou, was established to conduct a research project with the theme “Constructing a new model of contactless medical service based on outpatients’ experience.” According to the ten steps and PDCA cycle, an analysis was carried out before and after the QCC activities, focusing on improving pre-consultation services, providing steward-like services, and facilitating post-consultation management. Results: After the QCC activities, the mobile appointment rate, missed appointment rate, the proportion of smart check-ins, and the average check-in time were 55.68%, 4.02%, 39.75%, and 8.24 ± 3.66 min, respectively; in contrast, before the activities, they were 32.00%, 7.88%, 0.00%, and 14.96 ± 4.98 min, respectively; the difference between the two groups was statistically significant (χ2 = 3480.112, 4994.496; Fisher’s exact probability = 963788.570; t = 5.323, P &amp;lt; 0.001). Many experts have also visited the hospital to learn about this system, thus rendering social and economic benefits. Conclusion: Project-achieving QCC activities are suitable for complex situations, such as constructing a new model of contactless medical service, and can significantly improve outpatient service quality, enhance patients’ experience, and improve the abilities of circle members.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Wang X, Li Y, Li J, et al., 2015, The Practice and Effectiveness of Implementing “Barrier-Free Medical Treatment” in Our Hospital. Chinese Hospital Management, 35(06): 73–74.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Xiang G, Zeng Z, Shen Y, 2016, Research on the Current Situation and Development Trend of My Country’s Smart Medical Construction. China All Sciences, 19(24): 2998–3000.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Yang X, Liu Y, Wang X, et al., 2022, Optimization and Implementation Effect of Non-Contact Smart Outpatient Consultation Process. Journal of Nursing, 37(06): 69–71.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>2021, The General Office of the National Health Commission Issued a Classification Evaluation Standard System for Hospital Smart Management (Trial Implementation). Journal of Medical Informatics, 42(04): 94.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Qin G, Wang L, 2020, Instruction Manual for Quality Management Group Innovation Activities, 1st Edition, Zhejiang University Press, Hangzhou, 15.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Liu T, Wu C, 2017, Theory and Operational Characteristics of Project-Based Quality Control Circle. Chinese Hospital, 21(09): 45–49.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>National Health Commission, 2019, Hospital Smart Service Grading Evaluation Standard System (Trial). China Digital Medicine, 14(08): 12 + 102 + 108 + 120.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Hu Z, 2022, Optimization and Application Exploration of Outpatient Visiting Process Based on Face Recognition. China Digital Medicine, 17(07): 50–54.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Zhang Y, Li D, Zhang J, et al., 2022, Empirical Research on Smart Outpatient Service Based on Six Sigma Management. Chinese Modern Doctor, 60(24): 95–98.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Liu Y, Gao C, Wang A, et al., 2019, The Practice of Project-Accomplished Quality Control Circle to Reduce the Restraint Rate of ICU Patients with Mechanical Ventilation. Journal of Nursing, 34(23): 54–57.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B11" content-type="article"><label>11</label><element-citation publication-type="journal"><p>Xiao K, Gu B, Zhao S, et al., 2020, Constructing a Prevention and Management Model of Venous Thromboembolism in Kidney Transplant Recipients Based on a Project-Based Quality Control Circle. Nursing Research, 34(21): 3910–3913.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B12" content-type="article"><label>12</label><element-citation publication-type="journal"><p>Liang X, Zhang S, Mao L, et al., 2019, The Application of the Project-Based Quality Control Circle in Improving the Awareness of Correct Medication in the Community Through Pharmaceutical Science Popularization. Practical Medicine and Clinic, 22(06): 668–672.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B13" content-type="article"><label>13</label><element-citation publication-type="journal"><p>Ping Y, Zhang Y, Wang D, et al., 2018, The Application of the Subject-Accomplished Quality Control Circle in the Transformation of the Discharge Drug Delivery Process. Medicine Herald, 37(01): 134–137</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
