<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JERA</journal-id><journal-title-group><journal-title>Journal of Electronic Research and Application</journal-title></journal-title-group><issn>2208-3502</issn><eissn>2208-3510</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jera.v9i1.9419</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Audit Recommendations for Final Accounts of Photovoltaic Power Generation Projects</title><url>https://artdesignp.com/journal/JERA/9/1/10.26689/jera.v9i1.9419</url><author>JiaJigang</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>1</issue><history><date date-type="pub"><published-time>2025-02-12</published-time></date></history><abstract>With the continuous adjustment of the energy structure, photovoltaic (PV) power generation projects are increasing, playing a crucial role in promoting the application of clean energy. However, the current audit of completed final accounts for photovoltaic power generation projects faces many challenges, such as incomplete institutional processes, scattered archive management materials, inadequate digital intelligence systems, and insufficient analysis of final account amounts. Based on this, this article aims to deeply analyze these issues and propose targeted audit suggestions to standardize the construction and audit work of photovoltaic power generation projects and promote the sustainable and healthy development of the photovoltaic power generation business.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Wei X, 2021, Common Problems and Suggestions in the Audit of Financial Final Accounts upon Completion of Basic Construction Projects. Finance and Economics, 2021(20): 148–149.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Wanglaoji Pharmaceuticals, 2024, Completion and Grid Connection of Photovoltaic Power Generation Project at Wanglaoji Pharmaceutical. Wine &amp; Beverage Technology and Equipment, 2024(01): 46–47. https://www.zhangqiaokeyan.com/academic-journal-cn_brew-beverage-technology-equipment_thesis/02012154332756.html</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Dai H, 2020, On How to Do a Good Job in the Audit of Financial Final Accounts upon Completion of Basic Construction Projects. Accounting Learning, 2020(22): 149–150.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Shi L, 2017, Discussion on How to Improve the Overall Efficiency of Photovoltaic Power Generation Projects Based on Project Management Optimization. Mechanical and Electrical Information, 2017(21): 160–161.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Huang Z, 2019, Analysis of Financial Risk Management in Photovoltaic Power Generation Enterprises. Modern Accounting, 2019(19): 119–120.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Wang Y, 2017, Discussion on the Problems and Countermeasures in the Process of Preparing the Financial Completion Final Account Report of Water Conservancy Infrastructure Projects. Modern Economic Information, 2017(18): 255.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Guan H, Jing J, Bai D, 2020, Analysis of the Benefits of Distributed Photovoltaic Power Generation Projects Based on Energy Performance Contracting. Energy and Energy Conservation, 2020(12): 65–66 + 79.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Min J, 2020, Cost Management of Photovoltaic Power Generation Projects. Marketing Circle, 2020(30): 168–169.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Zang B, 2019, Analysis of Key Points for Completion Settlement Audit of Photovoltaic Power Generation Projects. Electric Power and Energy, 40(06): 748–750.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Xu F, 2015, Discussion on the Tracking Audit Control and Methods of Photovoltaic Power Generation Construction Projects. Modern Accounting, 2015(08): 45–46.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
