<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JWA</journal-id><journal-title-group><journal-title>Journal of World Architecture</journal-title></journal-title-group><issn>2208-3480</issn><eissn>2208-3499</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jwa.v8i4.8134</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Construction Cost Control Strategy of Finished House Based on BIM-5D</title><url>https://artdesignp.com/journal/JWA/8/4/10.26689/jwa.v8i4.8134</url><author>XiaDongchun,ZhouXinyue</author><pub-date pub-type="publication-year"><year>2024</year></pub-date><volume>8</volume><issue>4</issue><history><date date-type="pub"><published-time>2024-09-02</published-time></date></history><abstract>Building Information Modeling (BIM) technology can not only achieve project refinement management of the construction process based on a 3D model but also form a BIM-5D model based on the fusion of progress data and cost data to achieve the dynamic control of the whole process of project cost. This paper discusses the application of BIM-5D in the cost control of finished house construction, aiming to provide technical reference for China’s finished house project units, so that they can master how to realize the construction of cost control system based on BIM, the monitoring of the key coefficients of the cost, corrective action, to ensure that the project cost deviation is within the controllable range, and to make an effective guarantee for the economic benefits of the project construction.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Li Y, Jiang A, Dong Y, et al., 2024, Research on Construction Cost Management of Construction Projects based on BIM 5D. China Storage and Transportation, 2024(07): 94–95.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Shen W, 2024, Research on the Application of Project Cost Visualisation based on BIM. Bulk Cement, 2024(03): 210–212 + 215.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Liu H, 2024, Research on Construction Organisation Design Management System based on BIM/5D. China Construction Metal Structure, 23(05): 145–147.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Tang Z, 2024, Research on Dynamic Management and Cost Optimisation Control of Construction Project Cost. Vitality, 42(09): 151–153.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Ren L, 2024, Application of BIM in the Whole Process Control of Construction Project Cost. Sichuan Building Materials, 50(05): 217–218.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Dong L, 2023, Application of BIM Technology in Construction Cost Control of Engineering Projects. Construction Science and Technology, 7(4): 48–50.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Liang J, Chang Z, Gong L, et al., 2023, Research on the Application of BIM5D and Earned Value Method in Engineering Construction Cost Management. Shanxi Construction, 49(23): 195–198.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Chen X, Research on the Application of BIM Virtual Construction Technology in Housing Construction Project Management. International Aid, 2022(3): 133–135.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Chen G, 2022, Application of BIM Technology in Construction Project Management and Cost Control. China Real Estate Industry, 2022(11): 120–122.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Tu L, 2023, Research on Whole Process Cost Control of Building Construction Project based on BIM. China Construction Information Technology, 2023(23): 78–81.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
