<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JWA</journal-id><journal-title-group><journal-title>Journal of World Architecture</journal-title></journal-title-group><issn>2208-3480</issn><eissn>2208-3499</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jwa.v9i4.11807</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>A Framework of Information Sharing Platform for Prefabricated Building Supply Chain Based on BIM</title><url>https://artdesignp.com/journal/JWA/9/4/10.26689/jwa.v9i4.11807</url><author>ZhangMin,BianYanxiao</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>4</issue><history><date date-type="pub"><published-time>2025-09-04</published-time></date></history><abstract>In view of the imperfect supply chain management of prefabricated building, inadequate information interaction among the participating subjects, and untimely information updates, the integration and development of BIM technology plus the supply chain of prefabricated building is analyzed, and the problems existing in the current supply chain and the application of BIM technology at various stages are elaborated. By analyzing the structural composition of the prefabricated building supply chain, an information sharing platform framework for prefabricated building supply chain based on BIM was established, which serves as a valuable reference for managing prefabricated building supply chains. BIM technology aligns well with assembly construction, laying a solid foundation for their synergistic development and offering novel research avenues for the prefabricated building supply chain.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Chen Y, Chen S, 2023, Research Progress of Prefabricated Building Based on BIM. Research and Exploration in Laboratory, 42(11): 235–242.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Janappriya J, Malindu S, Jayasinghe JASC, Kulatunga A, Zhang G, 2023, A Comparative Life Cycle Assessment of Prefabricated and Traditional Construction – A Case of a Developing Country. Journal of Building Engineering, 72: 101173.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Shi Q, Wang Q, 2021, Influence Mechanisms of Collaborative Innovation Activities and BIM Application on Innovation Performance in Construction Supply Chain. Journal of Civil Engineering and Management, 38(5): 91–97.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Liu L, Ren X, Dai X, 2021, Research on Collaborative Subject Selection of Prefabricated Building Supply Chain for Dynamic Alliance. Construction Economy, 42(11): 61–66.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Liu P, Li Q, 2017, Research on Application of BIM in Information Flow of Prefabricated Building Supply Chain. Construction Technology, 46(12): 130–133.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Chen G, Yan Z, Chen J, et al., 2022, Building Information Modeling (BIM) Outsourcing Decisions of Contractors in the Construction Industry: Constructing and Validating a Conceptual Model. Developments in the Built Environment, 12: 100090.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Getuli V, Ventura SM, Capone P, et al., 2016, A BIM-Based Construction Supply Chain Framework for Monitoring Progress an2d Coordination of Site Activities. Procedia Engineering, 164: 542–549.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Chatzimichailidou M, Ma Y, 2022, Using BIM in the Safety Risk Management of Modular Construction. Safety Science, 154: 104654.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Lee JY, Irisboev IO, Ryu Y, 2021, Literature Review on Digitalization in Facilities Management and Facilities Management Performance Measurement: Contribution of Industry 4.0 in the Global Era. Sustainability, 13(23): 13432.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Edirisinghe R, Zelinna P, Anumba C, et al., 2021, An Actor–Network Approach to Developing a Life Cycle BIM Maturity Model (LCBMM). Sustainability, 13(23): 13273.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B11" content-type="article"><label>11</label><element-citation publication-type="journal"><p>Mojumder A, Singh A, 2021, An Exploratory Study of the Adaptation of Green Supply Chain Management in Construction Industry: The Case of Indian Construction Companies. Journal of Cleaner Production, 295: 126400.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B12" content-type="article"><label>12</label><element-citation publication-type="journal"><p>Shishehgarkhaneh MB, Moehler RC, Fang Y, et al., 2024, Construction Supply Chain Risk Management. Automation in Construction, 162: 105396.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B13" content-type="article"><label>13</label><element-citation publication-type="journal"><p>Han Y, Yan X, Piroozfar P, 2023, An Overall Review of Research on Prefabricated Construction Supply Chain Management. Engineering, Construction and Architectural Management, 30(10): 5160–5195.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B14" content-type="article"><label>14</label><element-citation publication-type="journal"><p>Hua Y, Zhang Y, Zhang S, et al., 2023, Using Building Information Modeling to Enhance Supply Chain Resilience in Prefabricated Buildings: A Conceptual Framework. Applied Sciences, 13(23): 244–259.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B15" content-type="article"><label>15</label><element-citation publication-type="journal"><p>Li Y, Xie J, 2021, Research on the Application of BIM in Prefabricated Building Construction Stage. Intelligent Building and Smart City, 7: 92–93.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B16" content-type="article"><label>16</label><element-citation publication-type="journal"><p>Xia Q, Yu D, Jiang W, et al., 2024, Research Progress of Intelligent Management of Supply Chain of PC Components in Prefabricated Buildings. Construction Technology (Chinese and English), 7: 1–13.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B17" content-type="article"><label>17</label><element-citation publication-type="journal"><p>Shang Y, Dang H, Zhao Q, 2023, Research on Collaborative Optimization Management and Platform Construction of Prefabricated Building Supply Chain Enterprises Based on BIM Technology. Journal of Shijiazhuang Railway Vocational and Technical College, 22(3): 1–4, 58.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B18" content-type="article"><label>18</label><element-citation publication-type="journal"><p>Du Y, Song D, 2022, Research on Key Problems and Countermeasures of Supply Chain Management of Prefabricated Buildings. Construction Technology, 2022(16): 63–66.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B19" content-type="article"><label>19</label><element-citation publication-type="journal"><p>Su J, Sun Z, Chen D, et al., 2021, Research and Application of Integrated Information System for Prefabricated Building Design, Production and Construction. Engineering Quality, 39(5): 53–58.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B20" content-type="article"><label>20</label><element-citation publication-type="journal"><p>Chen Y, Sun Z, 2019, Research on the Collaborative Management of Prefabricated Building Supply Chain under EPC Mode. Value Engineering, 38(15): 47–49.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B21" content-type="article"><label>21</label><element-citation publication-type="journal"><p>Qiu D, 2016, The Collaborative Visual Management Technology and Application of Prefabricated Buildings Based on Information Control. Construction, 38(10): 1476–1478.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B22" content-type="article"><label>22</label><element-citation publication-type="journal"><p>Hua Y, Zhang Y, Zhang S, Hou F, 2023, Using Building Information Modeling to Enhance Supply Chain Resilience in Prefabricated Buildings: A Conceptual Framework. Applied Sciences, 13(23): 12694.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B23" content-type="article"><label>23</label><element-citation publication-type="journal"><p>Li X, 2021, EPC Project Management Management Based on BIM, thesis, Chongqing University.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B24" content-type="article"><label>24</label><element-citation publication-type="journal"><p>Guo X, 2023, Research and Application of BIM Technology in Railway Line Engineering, thesis, China University of Mining and Technology.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B25" content-type="article"><label>25</label><element-citation publication-type="journal"><p>Wei L, Wen X, Zhang Z, 2024, A Configuration Approach to Build Supply Chain Resilience: From Matching Perspective. Expert Systems With Applications, 249: 105945.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B26" content-type="article"><label>26</label><element-citation publication-type="journal"><p>Lin J, Lin S, Benitez J, et al., 2023, How to Build Supply Chain Resilience: The Role of Fit Mechanisms Between Digitally-Driven Business Capability and Supply Chain Governance. Information &amp; Management, 60(2): 103747.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B27" content-type="article"><label>27</label><element-citation publication-type="journal"><p>Sohrab DY, Flanagan R, Langroudi AA, et al., 2024, Understanding the Complexity of Materials Procurement in Construction Projects to Build a Conceptual Framework Influencing Supply Chain Management of MSMEs. International Journal of Construction Management, 24(2): 101735.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B28" content-type="article"><label>28</label><element-citation publication-type="journal"><p>Chowdhury JM, Mohammad I, Abdul Malek ABM, et al., 2024, Exploring the Manufacturing Flexibility Issues to Build a Framework to Implement the Manufacturing Flexibility of a Supply Chain: A Review. International Journal of Industrial and Systems Engineering, 46(3): 295–322.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B29" content-type="article"><label>29</label><element-citation publication-type="journal"><p>Ryanjani TM, Bai H, 2023, A Framework to Build a Resilient Supply Chain: A Case Study of Javanese Tea Chain in Indonesia. The International Journal of Logistics Management, 34(6): 1629–1648.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B30" content-type="article"><label>30</label><element-citation publication-type="journal"><p>Liu W, Fan G, Liu Z, 2024, Driving Factors in Carbon Emission Reduction in Prefabricated Building Supply Chains Based on Structural Equation Modelling. Sustainability, 16(8): 4661</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B31" content-type="article"><label>31</label><element-citation publication-type="journal"><p>Singh RK, Modgil S, 2024, Impact of Information System Flexibility and Dynamic Capabilities in Building Net Zero Supply Chains. Journal of Enterprise Information Management, 37(3): 993–1015.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
