<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JWA</journal-id><journal-title-group><journal-title>Journal of World Architecture</journal-title></journal-title-group><issn>2208-3480</issn><eissn>2208-3499</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jwa.v9i4.11842</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Optimization of Technical Briefing Management Process in Construction Projects</title><url>https://artdesignp.com/journal/JWA/9/4/10.26689/jwa.v9i4.11842</url><author>ZhuangZhiwei</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>4</issue><history><date date-type="pub"><published-time>2025-09-08</published-time></date></history><abstract>This paper examines the challenges in the technical briefing process for construction projects, including a three-level system and issues related to formalization. An optimization approaches was introduced based on the PDCA cycle, alongside the application of BIM and AR technologies. The key preparatory measures were outlined in this study and the functions of the management system was mentioned. Through case comparisons, this paper demonstrated that these optimizations can significantly improve efficiency and quality, support the development of an evaluation system to verify results, and highlight the critical role of organizational support.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Guo X, 2022, Research on Construction Project Process Optimization of X Construction Enterprise Based on DMAIC, thesis, Ningbo University, Zhejiang.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Xin P, 2023, Research on Optimization of Engineering Procurement Management Process in Dili Group's Agricultural Wholesale Market, thesis, Shenyang Jianzhu University, Liaoning.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Yang M, 2022, Research on Engineering Project Cost Management of Enterprise A Under the Integration of Business and Finance, thesis, Anhui University, Anhui.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Du L, 2018, Research on Optimization of Construction Project Management Process Based on BIM, thesis, Hebei University of Engineering, Hebei.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Song H, 2021, Research on Reengineering of Construction Enterprise Project Management Process Based on BIM, thesis, Tianjin University of Technology, Tianjin.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Song W, 2020, Research on Optimization of Fine Management of HA Construction Project, thesis, Guangxi University.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Peng Z, 2020, Exploring the Key Points of Technical Management in Construction Projects, Smart City, 6(03): 85–86.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Chen Y, 2013, My Views on Safety Technical Disclosure in Construction Projects, Modern Decoration (Theory), 2013(12): 246.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>You W, Guan Y, 2015, Analysis on How to Strengthen the Management of Construction Technology Disclosure, Building Materials and Decoration, 2015(43): 122–123.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Zhang W, Deng W, 2016, Analysis on Construction Technology Disclosure in Construction Engineering, Science and Technology Outlook, 26(23): 32.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
