<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JWA</journal-id><journal-title-group><journal-title>Journal of World Architecture</journal-title></journal-title-group><issn>2208-3480</issn><eissn>2208-3499</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jwa.v9i5.12523</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Technical Management and Risk Management Practices for a High-Rise Public Building Project in Guangzhou Nansha Free Trade Zone</title><url>https://artdesignp.com/journal/JWA/9/5/10.26689/jwa.v9i5.12523</url><author>LinFuxuan</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>5</issue><history><date date-type="pub"><published-time>2025-10-30</published-time></date></history><abstract>The construction project of a non-super high-rise public building in Guangzhou’s Nansha Free Trade Zone faces unique challenges. The project established a full-cycle technical management system, encompassing technical management across various sectors and BIM collaboration. Simultaneously, it introduced advanced technical management such as deep foundation pits and core tube construction, along with a risk management system and special weather response strategies. Through these measures, the project achieved numerous significant results, forming a unique management paradigm that offers valuable insights for similar engineering projects.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Pei C, 2024, The Tenth Anniversary of Free Trade Pilot Zones in China: Fundamental Experiences and Enhancement Strategies. China Economist, 19(3): 2–20.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Lei X, Zheng D, Liu C, 2025, Design and Implementation of a Full-Lifecycle Management System for Civil Engineering Materials and Equipment, 2025 6th International Conference on Computer Engineering and Application (ICCEA), IEEE, 01–05.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Ge R, 2023, High-Quality Project Management Process Research Based on Both Excellent Cost and High Quality, 2023 4th International Conference on Management Science and Engineering Management (ICMSEM 2023), Atlantis Press, 333–342.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Mikhnenko PA, 2024, Analysis of Multimodal Data in Project Management: Prospects for Using Machine Learning. Manage Sci, 13(4): 71–89.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Zou Y, 2022, Dynamic Cost Control in Construction Engineering Management. World Scientific Research Journal, 8(2): 426–432.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Wang Y, 2024, Risk Assessment of Construction Projects in Full-Process Engineering Consulting Using Analytic Hierarchy Process. International Journal of Multiphysics, 18(3).</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Lu Y, Gong P, Tang Y, et al., 2021, BIM-Integrated Construction Safety Risk Assessment at the Design Stage of Building Projects. Automation in Construction, 124: 103553.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Parnell GS, Driscoll PJ, Henderson DL (Eds.), 2022, Decision Making in Systems Engineering and Management, John Wiley &amp; Sons.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Farouk AM, Rahman RA, 2025, Integrated Applications of Building Information Modeling in Project Cost Management: A Systematic Review. Journal of Engineering, Design and Technology, 23(1): 287–305.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Kordi NE, Belayutham S, Che Ibrahim CKI, 2025, Development and Demonstration of a Social Sustainability Assessment Tool for the Construction Project Life Cycle. Construction Innovation, 25(1): 161–186.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
