<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JWA</journal-id><journal-title-group><journal-title>Journal of World Architecture</journal-title></journal-title-group><issn>2208-3480</issn><eissn>2208-3499</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jwa.v9i6.13417</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Research on the Collaborative Development Path of Construction Project Management and Construction Technology</title><url>https://artdesignp.com/journal/JWA/9/6/10.26689/jwa.v9i6.13417</url><author>PeiYan</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>6</issue><history><date date-type="pub"><published-time>2025-12-31</published-time></date></history><abstract>This paper discusses the significance of the collaborative development of construction project management and construction technology. It analyzes issues in their cooperation, especially in waste-to-energy projects, which face technical complexity and management challenges. It also explores technology-driven efficiency opportunities, process re-engineering, and various decision-making models. Case studies illustrate their application, and synergy efficiency indicators and lifecycle impact assessment are used for evaluation. Finally, it proposes implementation roadmaps and intelligent collaboration platforms for future research.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Chen Y, Wang J, Li H, 2021, Integration of BIM and ERP in Construction Project Management: A Case Study of Waste-to-Energy Plants. Automation in Construction, 2021(132): 103934.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Zhang L, Liu W, Wang Y, 2022, Technical Challenges and Management Strategies in Waste-to-Energy Facility Construction. Renewable and Sustainable Energy Reviews, 2022(168): 112865.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Li X, Zhang Q, Chen Z, 2023, Collaborative Decision-Making Model for Construction Technology Integration. Advanced Engineering Informatics, 2023(56): 101987.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Wang H, Sun T, Xu M, 2021, Process Re-Engineering in Environmental Project Management: Lessons from Energy Conversion Projects. Journal of Cleaner Production, 2021(317): 128391.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B5" content-type="article"><label>5</label><element-citation publication-type="journal"><p>Garcia A, Kim D, Park J, 2022, IoT-Based Equipment Monitoring for Construction Technology Optimization. Engineering, Construction and Architectural Management, 29(7): 2789–2805.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B6" content-type="article"><label>6</label><element-citation publication-type="journal"><p>Zhao M, Liu Y, Zhang K, 2020, Predictive Analytics in Technical Risk Management of Power Plant Construction. Advanced Engineering Informatics, 2020(46): 101176.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B7" content-type="article"><label>7</label><element-citation publication-type="journal"><p>Sun W, Chen G, Lee H, 2021, Lifecycle Impact Assessment of Collaborative Construction Approaches. Sustainable Cities and Society, 2021(75): 103318.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B8" content-type="article"><label>8</label><element-citation publication-type="journal"><p>Smith J, Brown K, Taylor R, 2022, Multi-Stakeholder Coordination Mechanisms in Environmental Infrastructure Projects. International Journal of Project Management, 40(3): 245–259.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B9" content-type="article"><label>9</label><element-citation publication-type="journal"><p>Xu Z, Wang Q, Li J, 2023, BIM Applications in Plant Layout Optimization: Emerging Trends and Case Studies. Energy and Buildings, 2023(278): 112653.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B10" content-type="article"><label>10</label><element-citation publication-type="journal"><p>Huang L, Zheng Y, Zhou X, 2021, Digital Twins for Emission Control System Commissioning in Thermal Plants. Building and Environment, 2021(204): 108167.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B11" content-type="article"><label>11</label><element-citation publication-type="journal"><p>Wang T, Chen S, Liu C, 2023, Synergy Efficiency Indicators for Construction Management-Technology Integration. Journal of Construction Engineering and Management, 149(2): 04022156.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B12" content-type="article"><label>12</label><element-citation publication-type="journal"><p>Kim S, Park J, Lee S, 2020, Laser Alignment Technologies in Turbine-Generator Installation Management. Measurement, 2020(163): 107956.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B13" content-type="article"><label>13</label><element-citation publication-type="journal"><p>Liu B, Zhang H, Wang X, 2022, Adaptive Workflow Models for Boiler System Construction Scheduling. Automation in Construction, 2022(137): 104198.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B14" content-type="article"><label>14</label><element-citation publication-type="journal"><p>Yang R, Li M, Wu Q, 2021, Environmental Compliance Management in SCR System Installation Projects. Journal of Environmental Management, 2021(299): 11361.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
