<?xml version="1.1" encoding="utf-8"?>
<article xsi:noNamespaceSchemaLocation="http://jats.nlm.nih.gov/publishing/1.1/xsd/JATS-journalpublishing1-mathml3.xsd" dtd-version="1.1" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance"><front><journal-meta><journal-id journal-id-type="publisher-id">JWA</journal-id><journal-title-group><journal-title>Journal of World Architecture</journal-title></journal-title-group><issn>2208-3480</issn><eissn>2208-3499</eissn><publisher><publisher-name>Bio-Byword Scientific Publishing Pty. Ltd.</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.26689/jwa.v9i6.13428</article-id><article-categories><subj-group subj-group-type="heading"><subject>Article</subject></subj-group></article-categories><title>Key Points of On-Site Management for the Construction Party of Building Electrical Engineering Construction</title><url>https://artdesignp.com/journal/JWA/9/6/10.26689/jwa.v9i6.13428</url><author>LiuGuosha</author><pub-date pub-type="publication-year"><year>2025</year></pub-date><volume>9</volume><issue>6</issue><history><date date-type="pub"><published-time>2025-12-31</published-time></date></history><abstract>In construction projects, electrical engineering is an important component, mainly including pre-installed conduits, embedded parts, grounding wires, etc., and it is carried out concurrently with the civil engineering. Managers should follow relevant standards to lay wires and cables and install and debug equipment to ensure their normal operation. Only when all the above aspects meet the predetermined standards can quality assessment and completion acceptance be conducted. Electrical engineering is related to the quality, progress, capital investment, and goal achievement of the entire project. Therefore, this article conducts an in-depth discussion on the key management points of the construction site for building electrical engineering projects.</abstract><keywords/></article-meta></front><body/><back><ref-list><ref id="B1" content-type="article"><label>1</label><element-citation publication-type="journal"><p>Ye J, 2023, Research on Key Points of On-Site Management for the Construction Party in Building Electrical Construction. Jiangsu Building Materials, 2023(5): 166–167.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B2" content-type="article"><label>2</label><element-citation publication-type="journal"><p>Zhuang Z, 2023, Analysis of Key Points in Electrical Management at the Construction Site of Xiamen S Building Project. China Construction Metal Structure, 2023(2): 174–176.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B3" content-type="article"><label>3</label><element-citation publication-type="journal"><p>Zhou X, 2022, Problems and Solutions in the On-Site Management of Building Electrical Engineering. Jiangsu Building Materials, 2022(6): 136–137.</p><pub-id pub-id-type="doi"/></element-citation></ref><ref id="B4" content-type="article"><label>4</label><element-citation publication-type="journal"><p>Lin H, 2021, Problems and Solutions in the On-Site Management of Building Electrical Engineering. Sichuan Building Materials, 47(10): 194–195.</p><pub-id pub-id-type="doi"/></element-citation></ref></ref-list></back></article>
